Spain: 2003
Prepared a detailed open pit mine plan for the Las Cruces ore body, located at a depth of between 120 and 210 m using Vulcan software. The mine will be equipped with hydraulic backhoe excavators, 90 and 150 t trucks, drilling rigs and auxiliary equipment. The mine will feed to a hydrometallurgical plant to be built on site, which will produce 66 000 tonnes of copper per year over a lifetime of 15 years.